EXPERIENCE:
Energy Savings
Paid for this Project

Problem: A customer needed to increase operating efficiencies of a -45°F two stage refrigeration system with rotary vane booster compressors and reciprocating high stage compressors. In the last several years some screw compressors had been added to the system.

Solution: Gartner Refrigeration, working along with the power utility company, found a way to substantially lower the energy consumption of the plant by replacing the rotary vane compressors with screw compressors. An undersized intercooler was replaced during this project as well.

As a result five high stage reciprocating compressors that were no longer needed could be turned off. The savings were so great that the utility company financed virtually all of it.

 

print industrial refrigeration page Print This Page 